We can offer a different solution of retaining materials whilst excavating, our process involves pre drilling holes at the required spacings and installing I beams or universal columns vertically.

Once placed level in both directions the beams are concreted in and then the  holes are back filled, after this we start to remove the sand in between the I Beams 1 bay at a time and place horizontal timber or concrete sleepers inside the webs of the beams.

As this process is done sand is filled behind the sleepers  as they are lowered between the beams, this is repeated in each bay until complete leaving a straight, neat and  clean area.

This system can be used permanent or temporary shoring system.